Equipment status capture
Voice capture from operators and technicians, structured against your asset register and written into maintenance records. The breakdown report that currently travels by radio becomes data.
>
In one line: berth planning, crane scheduling and yard optimisation are well served by established vendors. The gap is the dark data — a substantial share of what determines equipment availability travels by VHF radio, WhatsApp and verbal handover and never reaches the TOS.
Last updated:
Your terminal operating system knows what it was told. It doesn’t know the reefer plug that’s been intermittent for a week, the crane operator’s note about the spreader, or the verbal agreement with the haulier about tomorrow’s slot.
That information exists. It just isn’t anywhere queryable, which means planning runs on an incomplete picture and every handover loses a little more.
Voice capture from operators and technicians, structured against your asset register and written into maintenance records. The breakdown report that currently travels by radio becomes data.
Slot booking, appointment changes, driver comms and gate refusal handling. Hauliers get answers instantly; your gate team stops answering the phone.
Missed slots, equipment unavailability, documentation gaps and rehandle decisions — assembled with full context, resolved where delegated, escalated where not.
What one shift knows, the next shift gets — searchable months later when an investigation asks.
Chasing incomplete documentation before it becomes a gate problem.
| Today | With an agent | |
|---|---|---|
| Equipment fault report | Radio, then maybe a log | Captured, structured, in the CMMS |
| Haulier slot query | Phone call to the gate office | Answered instantly |
| Missed slot | Discovered at the gate | Detected, rebooked, notified |
| Shift handover | Verbal, unrecorded | Structured and searchable |
| Rehandle decision | Operator judgement, unlogged | Logged with reasoning |
The same workflows, described by the job rather than the sector.
No. Agents act through its API and capture the operational reality it never receives.
It reads status and coordinates around it. It does not control it.
Handled natively across languages without separate builds.
Typically 6–10 weeks from audit sign-off, with the TOS integration usually the longest pole.
Every sector page describes the workflows we’d expect to find. Yours will differ in ways that matter, and the audit is designed for exactly that — you get evidence about your own business rather than someone else’s.