> Guides to Building AI Agents | DeityLabs
DeityLabs
Book the audit →

Guides

Long-form reference on the parts of this work that decide outcomes. Written to be useful to someone who ends up building it themselves.

The short version: long-form, answer-led guides to the workflows we automate — the depth behind the industry pages, written for the operator who wants to understand the problem before talking to anyone.

Last updated:

Pillar guides

A buyer’s guide to AI agents for operations

How to tell an agent project that will reach production from one that will not — before you spend anything. Scoping, integration feasibility, evaluation, and the questions that separate engineering from sales.

In this guide
What an agent is, and what it is not
The five questions to ask any vendor
Why integration decides feasibility, not the model
Reading a fixed price versus an estimate
What a good scope document contains
[FULL GUIDE — TO BE WRITTEN]

Evaluating AI agents: the discipline nobody sells you

The single largest difference between an agent that holds up and one that quietly degrades. What an eval suite is, how to build one from your own cases, and what to require contractually.

In this guide
Building a regression set from real cases
What to measure, and what not to
Detecting drift three months after launch
Running evals through a model deprecation
What to put in the contract
[FULL GUIDE — TO BE WRITTEN]

Integration reality: what your systems will actually allow

The audit’s hardest question, answered generically. Which platforms expose usable APIs, which are partner-gated, which need a bridge, and how to test before committing.

In this guide
Read access versus write access
Partner-gated APIs and how to get through them
Legacy systems without APIs
Rate limits, pagination and partial failure
Testing feasibility in five days
[FULL GUIDE — TO BE WRITTEN]

From pilot to production

Why most agent proofs of concept never deploy, and the sequence that avoids it. Shadow mode, staged rollout, rollback paths, and the escalation design that earns trust.

In this guide
Scoping for deployment, not demonstration
What shadow mode proves
Staged rollout: overflow, percentage, primary
Designing escalation
The rollback path you test before you need it
[FULL GUIDE — TO BE WRITTEN]

Agents in regulated and field operations

What changes when the work happens on a site, under a permit, with intermittent connectivity and a regulator. Evidence capture, attestation boundaries and offline design.

In this guide
Why the agent never attests
Contemporaneous capture versus reconstruction
Offline-first field design
Modelling overlapping obligations
What auditors actually want to see
[FULL GUIDE — TO BE WRITTEN]

Frequently asked questions

How are guides different from the industry pages?

Industry pages describe what we build and for whom. Guides go deeper on the problem itself — the workflow’s failure modes, the integration realities, what good looks like — whether or not you hire anyone.

Will you write a guide for my industry?

The queue follows the same rule as everything here: depth follows deployments. If you’re in an industry we’re actively building for, ask — it may already be in progress.

Why these and not a blog

Five guides that stay current are worth more than fifty posts that don’t. Each one is maintained rather than dated, and each is written to answer a question a buyer actually has before they commit money.

If you want something covered that isn’t here, tell us — we’d rather write what’s asked for than guess.

Glossary →Book the audit →